Cabinets (general): Peter, could you let us know when you are going to start making cabinets. I think it would be good to review everything with Melissa. We will start measuring up once the sheet rock is done. Hopefully next week. After that 10+ weeks until delivery.

Bookshelves opposite TV: These are 10” deep, which is a good depth for most books, however looking back at pictures of your old shelves they are deeper to hold the larger albums. If you think these 10” shelves may not be deep enough, now is the time to address it. 10" is a little shallow. I would give it at least 11".

Built in Seat: We decided this would be better at 2’-6” deep (previously 1’-10). Add 8” to cushion width. OK

Cabinets under TV: These are shown as open in the 5-19-11 set, but we decided to have doors, I will revise. OK

Casings: Melissa would like to use the casing with a profile instead of the flat casing to match the existing casings in the house. I think the Anderson McQuaid A&M30208 is a close match. Maybe we could get a few feet of to verify? OK

Powder room sink: To be continued after today’s email exchange. OK

2nd Floor bathroom: We eliminated the open shelves opposite the mirror and decided to get a store bought medicine cabinet adjacent to the window. See attached PDF. OK