CLICK AN IMAGE TO ENLARGE
Showing posts with label Change Orders. Show all posts
Showing posts with label Change Orders. Show all posts

Saturday, May 14, 2011

Meeting Notes 5/12

Today we had a walk through and discussed:
  1. New rot issue at back patio/ outdoor shower.
    This area has a built up bluestone patio area the surface of which is higher than the shingle siding and sills of the house. Over several years water and snow has been sitting here and seeping into the walls. Currently the wall adjacent to the outdoor shower has been exposed and we found completely rotted sills. We have also seen the wall at the back of where the shower is attached and that is rotted as well. We suspect that the wall perpendicular to this wall, under the living room is rotted has similar issues.
    The correct way to remedy this issue is to remove the bluestone patio, expose all of the rotted sills and repair them, dig the patio down to an appropriate height so that water shed away from the house, and then put it all back together.
    This is not a small project. However it doesn't have to be done right now but must be done in the next year or so.

  2. Accepted change orders include:
    CO 1 - Extra Demolition
    CO 2 - Center Windows
    CO 4 - Framing & Carpentry 1
    CO 6 - Sill rot repair
    CO 10 - Replace master shower door
    CO 12 - Master Shower Tile Note: wrong CO submitted (11). Actual CO = $3,456.00
    CO 13 - Fireplace tile
    CO 14 - Front Walkway Note: Steps and front entry not estimated as of yet. Stilling sussing out issues.
    CO 15 Outdoor shower floor Note: This may change based on direction we go with patio rot issue.
    CO 17 Plumbing Extras #1 Note: there will be some extras coming based on things that arose last week. i.e. the need for a pump system to drain the laundry room fixtures.
    CO 18 Sewer Tie In Note: This is an estimate. We are still waiting on final numbers based on what the town is requiring us to do.
    CO 19 Reframe Family Room wall
    CO 21 New Triple casement

  3. Rejected change orders include:
    CO 5 - Dec Renovation and carport

    CO 7 - Window replacement - Will replace all trim on lead windows on 2nd floor. The lower sash of these windows will be stripped where on their styles and rails and repainted. Tuning up of all window and storms remains a T&M task. Write up new CO and resubmit.

    CO 9 - Sonos music system - Will be reduced to 4 systems. (1) Deck, (1) Kitchen/Family room, (1) Dining Room, (1) Living Room and resubmit.

    CO 16 - Kids shower door Note: This is to be changed to a frameless shower door for cost savings and resubmit.

    CO 20 Master Bedroom Electrical Note: remove Lower bedside sconces and resubmit.

Thursday, May 5, 2011

Pantry Window Change 5/5/11

This is the window configuration that we like the best. These are casement windows.

Friday, April 29, 2011

Meeting Notes 4/28/11

Walk through with Melissa, Wendy,Lyle, Peter
The following are extra tasks added on by Melissa and Lyle.
  1. We will pad down the existing ceiling with 2x10 rafters sistered to the existing rafters for stiffness and for insulation R-value.

  2. We will push the beam at the pantry wall in by 5"-6" and frame it out to be a cased opening.

  3. Replace tile at fireplace.

  4. Tighten up all windows and storms on a T&M (time and materials) basis. Replace storms and screens as necessary.

  5. Add shower door in kids bath.

  6. Turn over porch deadbolt.

  7. Tear-out outdoor shower floor. Dig down. Add 4" of crushed stone. Set irregular flag stone pieces on top.

  8. Gut mudroom. and relocate as much plumbing and electric as possible. (In Progress)

  9. Remove any brass plumbing that is exposed and replace with Pex tubing.

  10. Connect house to town sewer.

  11. Install steel I beam at kitchen/hall wall and customize for plumbing waste. (In Progress)

  12. Relocate vent pipes from sink wall. (In Progress)

  13. Remove any exposed BX wiring and replace with Romex.

  14. Replace rotted sills at front of house. The extent is unknown until exposed. We also need to find the root of the problem. The cabinets in this area will be removed along with the wall above and the ceiling in the utility room. (In Progress)

  15. Asbestos removal. (In Progress)

  16. Add two new windows at right side of family room to match existing double-hungs. (In Progress)